Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13604843

- Product Categories
- Friendly Links
Information Name: | Anhui FRP cable pipe, Xiong Wang Thai (certified), FRP cable pipe |
Published: | 2014-11-19 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | Anhui FRP cable pipe, Xiong Wang Thai (certified), FRP cable duct provided by Xiong Wang Thai Plastic Products Factory. Xiong Wang Thai Plastic Products Factory (www.wangtai668.com) is specialized in the "plastic pipe, MPP power pipe, CPVC pipe electricity, irrigation pipe, HDPE pipe, p" of the enterprise, the company adhering to the "honesty, hard service" philosophy, to provide you with the highest quality products and services. Welcome to inquire! Contact: Fengjing Li. Installation requires a pipeline, the pipeline in response to the device before installing the nozzle, embedded parts, reservations concerning the pipeline installation holes, steel, etc. for review. 2, requires the slope of the pipe shall be adjusted drawings, the method can be used to adjust the seat to reach the slope requirements, welds should be set at ease maintenance, observe the place. Line 3, and transmission equipment connected internally to deal with clean before installation FRP cable pipe, welded fixed nozzle should generally stay away from the device, in order to avoid impact of stress on the transmission welding equipment installation precision. 4, before the pipe connected to the machine, should prevent a strong hand, check the flange in a free state parallelism and concentricity. 5, the valve should be mounted vertically, put into trial operation, a timely adjustment valve. The final adjustment valve on the system, opening and reseating pressure to comply with the provisions of the design documents. 6, the valve is installed before Jinan FRP cable pipe, according to the design file to check its model number, and press media flow to determine its mounting direction. When the valve and the pipe connected to the flange or threaded Taiyuan FRP cable pipes, valves should be installed in a closed state; such as by welding installation, the valve can not be closed. 7, the temporary replacement instrument components: all instrumentation components to install Baoding FRP cable pipes, are used to replace the temporary elements, and other pressure test, rinse, after the purge job, formally installed before feeding again. Not only has the original glass pipe transporting water and wastewater functions, but also has a certain fire performance. General fire performance is not to be known, in general, glass pipes are buried in the ground work. FRP pipe is not only acid salt has a very good performance, but also the life of the glass tube is relatively long, glass pipe has a certain fire performance. Long-term performance in frost glass pipe underground work is very excellent, the weight of the glass tube is relatively light, transportation more convenient, but also more convenient installation techniques, glass pipe in the case of these advantages, there are certain fire performance. Thus, in a glass pipe underground work is not only good anti-cold performance, there is a certain fire performance. |
Admin>>>
You are the 23004 visitor
Copyright © GuangDong ICP No. 10089450, Xiong Wang Thai Plastic Products Factory All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 23004 visitor
Copyright © GuangDong ICP No. 10089450, Xiong Wang Thai Plastic Products Factory All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility