Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13604843

- Product Categories
- Friendly Links
Information Name: | Jinan FRP cable pipe FRP cable pipe _ _ Xiong Wang Thai |
Published: | 2014-11-19 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | Installation requires a pipeline, the pipeline in response to the device before installing the nozzle, embedded parts, reservations concerning the pipeline installation holes, steel, etc. for review. 2, requires the slope of the pipe shall be adjusted drawings, the method can be used to adjust the seat to reach the slope requirements, welds should be set at ease maintenance, observe the place. Line 3, and transmission equipment connected internally to deal with clean before installation, welding should generally be fixed nozzle away from the machine to avoid welding impact of stress on transmission equipment installation precision. 4, before the pipe connected to the machine, should prevent a strong hand, check the flange in a free state parallelism and concentricity. 5, the valve should be mounted vertically, put into trial operation, a timely adjustment valve. The final adjustment valve on the system Baoding FRP cable pipe, opening and reseating pressure to comply with the provisions of the design documents. 6, before the valve is installed, according to the design file to check its model number, and press media flow to determine its mounting direction. When the valve and the pipe connected to the flange or threaded Jinan FRP cable pipes, valves should be installed in a closed state; such as by welding installation, the valve can not be closed. 7, the temporary replacement instrument components: all instrumentation components to install, are used to replace the temporary elements, and other pressure test, rinse, after the purge job, formally installed before feeding again. ⑩ Flange connection with the pipe, both from the inside of the tube to be welded, the flange surface and the inclination of the axis of the tube should be less than or equal to 1/100 of the outer diameter of the tube. Flange connection should strictly Hubei FRP cable pipe, the maximum allowable axial deviation is less than 2mm FRP cable pipe, the method may not be used to eliminate skew strong bolts. Tighten the bolts out twice, the first time evenly crosswise again, and then tighten the bolts. Jinan FRP cable pipe _ _ FRP cable duct provided by Xiong Xiong Wong Tai Mong Thai Plastic Products Factory. Xiong Wang Thai Plastic Products Factory (www.wangtai668.com) strong, credible, in Baoding UPVC pipe industry has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas will lead Xiong Wang Taihe you hand into the brilliant, for a better future! |
Admin>>>
You are the 23004 visitor
Copyright © GuangDong ICP No. 10089450, Xiong Wang Thai Plastic Products Factory All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 23004 visitor
Copyright © GuangDong ICP No. 10089450, Xiong Wang Thai Plastic Products Factory All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility