Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13604843

- Product Categories
- Friendly Links
Information Name: | Glass steel prices _ Xiong Wong Tai (certified) _ Heihe FRP |
Published: | 2015-05-27 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | Sleeves are more commonly refers to the cable wire protective sleeve, and glass pipes belong to a cable wire protection sleeve, therefore, also a glass pipe casing kind. Of course, the use of glass pipe, not just be used as a casing use, but also can be applied in the field of pipeline. The glass pipe generally more were buried deep underground to work. Many areas have glass casing in steel, is the general section sets out the other shaft or rod-type parts of the tube glass steel prices, but also a lot of action, depending on the environment have different functions requires HOBAS pipes, such as: shaft or rod-type parts protective effect of the protective sleeve, have played a supportive role in the support sleeve, the sleeve can also do some plain bearings, as well as the use of cable wire protective sleeve. The glass pipe as a cable wire protection sleeve used application is the most widely used pipe installation requirements 1, pipe before installing response equipment nozzle, embedded parts, set aside holes covering pipe installation, steel structure be reviewed. 2, requires the slope of the pipeline drawings shall be adjusted, the adjustment method can be used to achieve the grade requirement seat, easy to repair welds should be set, to observe the place. Line 3, and transmission equipment connected internally to handle clean before installation, welding fixed nozzle should generally be away from the machine, in order to avoid affecting welding stress on transmission equipment installation accuracy. 4, before the pipe connected to the machine, should be prevented relatively strong, check the flange in a free state parallelism and concentricity. 5, the safety valve should be installed vertically, put into trial operation, to timely adjust the safety valve. Final adjustment of the safety valve on the system RPMP opening and reseating pressure to comply with the provisions of the design documents. 6, before the valve is installed, check the model according to design documents, according to the medium flow to determine its mounting direction. When the valve flange or threaded pipe connected to the valve should be installed in a closed state; when as by welding installation, the valve can not be closed. 7, temporary replacement instrument element: all instrumentation components installed components are used temporary replacement, and other pressure test, wash, after the purge of work, formally installed before feeding again. Glass steel prices _ Xiong Wong Tai (certified) _ Heihe fiberglass by Xiong Wang Thai Plastic Products Factory. Xiong Wang Thai Plastic Products Factory (www.wangtai668.com) quality of service and products, continue to receive the recognition and trust of new and old customers and the industry. Our company is a certified member of the whole alliance network operators, business alliance customer service icon on the page, you can talk directly with our customer service staff, to our future cooperation happy! |
Admin>>>
You are the 23004 visitor
Copyright © GuangDong ICP No. 10089450, Xiong Wang Thai Plastic Products Factory All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 23004 visitor
Copyright © GuangDong ICP No. 10089450, Xiong Wang Thai Plastic Products Factory All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility